Walkathon Blog

All about walkathons

Archive for April, 2012

PRANK CONTEST!

Email your prank link to pvpwinner@gmail.com

Come join us and Walk during the Ovarian Cancer Walk on Saturday, September 10, 2011 at Memorial Hall in Fairmount Park, Philadelphia. If you are not local please feel free to leave a donation on our TEAM PVP fundraising page: http://bit.ly/oJFIjK

Follow us on Twitter:
http://twitter.com/PhillyChic5
http://twitter.com/JesseWelle
Facebook: http://facebook.com/prankvsprank

T-shirts http://www.districtlines.com/prankvsprank

Download end song FREE: ‪http://dephonic.bandcamp.com/‬

Our Mailing address:
PrankvsPrank
P.O. Box 2106

Duration : 0:5:57

Read More…

Technorati Tags: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Paignton Lions Club Walk Into The Sea 2010

Paignton Lions Club Charity Fancy Dress Walk Into The Sea, Paignton, Devon, Boxing Day 26th December 2010

Duration : 0:4:13

Read More…

Technorati Tags: , , , , , , , , , , , , , , , , , , , , , , , , ,

Prince George Relay for Life 2011

The Canadian Cancer Society Relay for Life was held in Prince George this past weekend and raised more than $330,000.

Duration : 0:1:32

Read More…

Technorati Tags: , , , ,

A Walkathon of the Incheon great bridge in Incheon of Korea 2009 No 1

The Incheon Bridge (also called the Incheon Long Bridge) is a newly-constructed bridge in South Korea. At its opening in October 2009, it became the second connection between Yeongjong Island and the mainland of Incheon. The 12.3 kilometres (7.6 mi) long bridge has a cable stayed section over the main sea route to Incheon port. This was the most difficult part to construct, with a main tower 230.5 metres (756.2 ft) high, vertical clearance of 74 m (243 ft), and five spans: a centre span of 800 m (2,625 ft) flanked on either side by spans of 260 m (853 ft) and 80 m (262 ft). Adjacent to the center section are approach spans consisting of a series of 150 m (492 ft) balanced cantilever spans. Lower level viaducts consisting of 50 m (164 ft) spans connect to land at each end of the bridge. The bridge cost over $1.4 billion (~1.25 trillion Won) to build. The main purpose of the bridge is to provide direct access between Songdo and Incheon International Airport, reducing travel time between them by up to one hour.
and New Icheon great bridge start traffic on Oct. 20.2009.

Duration : 0:8:39

Read More…

Technorati Tags: , , , , ,